• Facebook Social Icon
  • googlePlaces
  • twitter

22 Bankside, Kidlington OX5 1JE, UK

Tel -01865 377333

©2019 by Keith Cook Construction Ltd.

February 13, 2020

About the Pub 

Built around 1960 as part of a massive expansion of housing in the Neithrop area of Banbury, it is named after a local man who commanded the British forces during the Battle of Denmark Strait against the German battleship Bismarck.

It was a typical two roo...

January 14, 2020

About the Harwell site

The Research Complex at Harwell (RCaH) is a science-led national resource with a mission to enable and add value to outstanding new science that benefits, and benefits from, the UK’s Central Facilities.

We have a mix of research hubs, individual gr...

January 14, 2020

About the site from the wiki.

The Culham Centre for Fusion Energy (CCFE) is the UK's national laboratory for fusion research. It is located at the Culham Science Centre, near Culham, Oxfordshire, and is the site of the Joint European Torus (JET), Mega Ampere Spherical T...

December 12, 2019

Our latest project for Edgar Taylor continuing our long relationship working together.

This new community centre on the outskirts of Aylesbury will be completed late 2020 with KCC down to install the foundations, drainage and external works.

Currently we have instal...

December 12, 2019

Our first job for PDR Construction at Freeland Care Home, This will eventually form a new extension to the existing care home. KCC are currently preparing for the floor slab after since doing the reduce dig totalling over 4000m3 carted off site by our friends at Earthl...

July 31, 2019

The overhaul of the CO-OP in Kidlington has been going on for over 12 months with a complete renovation of the existing store, reducing to about 50% of its original ground floor size.

The location of the other 50% and existing carpark are now going to form the new custo...

June 24, 2019

Part of our new project for ISG Fit-Out we have began the enabling works. The pile matt was designed to have no recycled materials which meant using primary aggregates. Ordinarily we would not use primaries due to the cost but it was agreed to keep to the spec at all t...

February 27, 2019

Our latest development with SDC in Oxford is on the new Westway development. KCC are down to construct block F which will eventually house the new church some shops and upper offices. 

All foundations are reinforced ground beams with Cordek Side Form to the perimeters....

February 27, 2019

Our 3rd project for SDC on the Harwell Campus. This new building is circa 3500 m2 with a large external carpark and landscape corridor which stretches form our Cobalt build and continues through the Gemini and Genesis blocks. 

The project is schedules for completion on...

June 22, 2018

Another development for SDC at Harwell, this project began early 2018 but was delayed when ground conditions were not as expected when possession was taken. Since then a full stabilisation has been carried out down to 3m deep prior to foundations being dug.

KCC came in...

Please reload

Recent Posts

Please reload

Archive

Please reload

Tags

Please reload

Live Projects

  • Stanton Harcourt, Industrial Estate - Ongoing Maintenance (Private)

  • Freeland Care Home (PDR)

  • CO-OP Kidlington (Tompkins)

  • Admiral Holland (Edgar Taylor)

  • Aston Clinton (Edgar Taylor)

  • Culham RACE B1 (Midas Group)

  • Ditton Park (ISG)