Recent Posts

Archive

Tags

Live Projects

  • Stanton Harcourt, Industrial Estate - Ongoing Maintenance (Private)

  • Wantage Care Home (Stepnell)

  • CO-OP Kidlington (Tompkins)

  • Admiral Holland (Edgar Taylor)

  • Aston Clinton (Edgar Taylor)

  • Culham RACE B1 (Midas Group)

  • Holy Trinity Church (Edgar Taylor)

  • Summerfields School (Edgar Taylor)

  • Multi-Storey Carpark (MIDAS Group)

  • 13 new houses, Ardley (Harper Group)

  • New Road, Banbury (KCC)

  • Birch Park Homes (Private)

Stockley Park, West Drayton

One of our largest single projects to date. Keith Cook Construction carried out over 1.2m in groundworks over a 13 month period. At times we had over 27 men on site and 10 different pieces of plant. The building will eventually house Apples HQ. KCC started out here in September 2015 with an order for the ground works only. By the time we finished in 2016 we had secured and completed all the hard and soft landscaping preparation and finishes.

Bicester ECO School. "Gagglebrook School"

This is the first ECO School to build built in Oxfordshire and our first and last project with Carillion who went into administration 12 months after completion. We had inplemented many new safety procedures for this site and will be bringing these into use on our other projects. The school is made from clt timber frame and was trucked in from switzerland. The foundations and slab were poured over a 2 month period which included Christmas break. Once the timber was on site the shell was erected in around 6 weeks. KCC had both drainage and hard landscaping to complete before the final handover some 14 months after commencing on site.

  • Facebook Social Icon
  • googlePlaces
  • twitter

22 Bankside, Kidlington OX5 1JE, UK

Tel -01865 377333

©2019 by Keith Cook Construction Ltd.