Recent Posts

Archive

Tags

Live Projects

  • Stanton Harcourt, Industrial Estate - Ongoing Maintenance (Private)

  • Wantage Care Home (Stepnell)

  • CO-OP Kidlington (Tompkins)

  • Admiral Holland (Edgar Taylor)

  • Aston Clinton (Edgar Taylor)

  • Culham RACE B1 (Midas Group)

  • Holy Trinity Church (Edgar Taylor)

  • Summerfields School (Edgar Taylor)

  • Multi-Storey Carpark (MIDAS Group)

  • 13 new houses, Ardley (Harper Group)

  • New Road, Banbury (KCC)

  • Birch Park Homes (Private)

Reading University Library

Part of our new project for ISG Fit-Out we have began the enabling works. The pile matt was designed to have no recycled materials which meant using primary aggregates. Ordinarily we would not use primaries due to the cost but it was agreed to keep to the spec at all times. The softs spots and obstructions were removed below the matt area (12m x 12m) approx and then the area was built up in 150mm layers compacting with a 120 roller as we went. The finish had to be dead flat and the guys made a terrific job on the finish. Lift shafts and basement excavations completed by conveyors Externals well underway with drainage installed, granite paving and dutch clay blocks. Latest paving pictures. Re

  • Facebook Social Icon
  • googlePlaces
  • twitter

22 Bankside, Kidlington OX5 1JE, UK

Tel -01865 377333

©2019 by Keith Cook Construction Ltd.