Recent Posts

Archive

Tags

Live Projects

  • Stanton Harcourt, Industrial Estate - Ongoing Maintenance (Private)

  • Wantage Care Home (Stepnell)

  • CO-OP Kidlington (Tompkins)

  • Admiral Holland (Edgar Taylor)

  • Aston Clinton (Edgar Taylor)

  • Culham RACE B1 (Midas Group)

  • Holy Trinity Church (Edgar Taylor)

  • Summerfields School (Edgar Taylor)

  • Multi-Storey Carpark (MIDAS Group)

  • 13 new houses, Ardley (Harper Group)

  • New Road, Banbury (KCC)

  • Birch Park Homes (Private)

Aston Clinton

Our latest project for Edgar Taylor continuing our long relationship working together. This new community centre on the outskirts of Aylesbury will be completed late 2020 with KCC down to install the foundations, drainage and external works. Currently we have installed the foundations and bolt packs along with a new large crate system. With recent poor weather and cramped site boundaries has made for a difficult project.

Freeland Care Home

Our first job for PDR Construction at Freeland Care Home, This will eventually form a new extension to the existing care home. KCC are currently preparing for the floor slab after since doing the reduce dig totalling over 4000m3 carted off site by our friends at Earthline. We have now poured the foundations and are constructing the under slab drainage in preparation for the upper concrete slab. External Works

  • Facebook Social Icon
  • googlePlaces
  • twitter

22 Bankside, Kidlington OX5 1JE, UK

Tel -01865 377333

©2019 by Keith Cook Construction Ltd.