Recent Posts

Archive

Tags

Freeland Care Home

Our first job for PDR Construction at Freeland Care Home, This will eventually form a new extension to the existing care home. KCC are currently preparing for the floor slab after since doing the reduce dig totalling over 4000m3 carted off site by our friends at Earthline. We have now poured the foundations and are constructing the under slab drainage in preparation for the upper concrete slab.

External Works

  • Facebook Social Icon
  • googlePlaces
  • twitter

22 Bankside, Kidlington OX5 1JE, UK

Tel -01865 377333

©2019 by Keith Cook Construction Ltd.