Dove House Park - Oak Garage
This project is one of the smaller jobs we have carried out so it made a refreshing change to be involved with a local client who is developing his own home.
Work began with the setting out and checking of levels to ensure the garage sat at the correct height and in the correct place.
Witney Plant was on time as always with the machine and we dug the foundations and grabbed out the muck with our friends at SCB.
We then concrete with OXCRETE's volumetric truck and finally did the reduce dig.
We have investigated the existing drainage and ductwork which currently doesn't work with the site plan.
All finished and ready for the new owners.